Dara Sakor Reflections · Video

A red-earth road through the forest
near Phase I

Sixteen seconds of a red-earth road through the trees: this is how the roads around Phase I are being opened up, stretch by stretch.

By Tian Sisuo Length 16 s Date 2026-11-05
16 s

Source: Aerial footage by Coastal City Development Group · shot 5 Aug 2026 · reposted by Tian Sisuo, sales director, Soksan Sakor Land Phase I

Short answer

Aerial footage from Coastal City Development Group's files, shot on 5 Aug 2026 near Soksan Sakor Land Phase I: the camera looks down on a red-earth site road through the forest, vehicles driving and working along it, joining a darker sealed road at the end. Silent, 16 s.

What the footage shows

This 16-second film has one view: the drone looking straight down. From 0:00 a red-earth site road runs through the middle of the forest, vehicles driving along it; from 0:08 one end of the track meets a darker road surface, and the film ends there. It has no captions and no sound.

It was filmed on 5 August 2026 and comes from Coastal City Development Group's official files, shown as released. It answers a plain question for land buyers: what state are the roads around Phase I in right now. The picture shows only what was there that day; it does not judge the road class or mean the road is finished. For Phase I land and prices, see Phase I land prices.

Chapters

tap a time to jump

  1. Red-earth road and vehicles
  2. The track meets a sealed road

Transcript

Silent aerial footage with no narration; the chapter notes below serve as the text of the film.

About the footage

FAQ

Is Dara Sakor the same place as Qixinghai (七星海)?
Yes. 达拉沙果 is now the standard Chinese name, matching Dara Sakor in English, តារាសាគរ in Khmer and the highway signs. 七星海 (Qixinghai), seen in some of the group's films, is the former name and is left as it appears in the original.
Is Phase I built yet?
No. Phase I is at the stage of site levelling and internal roads, with no finished buildings. The finished buildings, shops and golf courses seen in the footage are nearby facilities outside the Phase I boundary.
Who made this, and can I share it?
It is official footage from Coastal City Development Group, the developer and operator of Dara Sakor, reposted here so it is easy to find and share; any cut is noted on this page. Feel free to share the link. For the original file or a site visit, contact me.

More videos

Site roads near Phase I from the forest to the works
Official · 54 s
Site roads near Phase I from the forest to the works

54 s of official aerial footage (5 Aug 2026): along a red-earth site road through the forest, past working vehicles, to levelled land and the coast.

A curve, an embankment and cleared plots road works near Phase I
Official · 22 s
A curve, an embankment and cleared plots road works near Phase I

22 s of official aerial footage (5 Aug 2026): a curving site road, stone and embankment, cleared plots and working vehicles.

From land to sea a pan near Phase I
Official · 23 s
From land to sea a pan near Phase I

23 s of official aerial footage (5 Aug 2026): from tall and curved buildings and greenery, across the works and the main road, to the coast and islands.

Turning above Phase I built-up blocks, forest and site roads
Official · 22 s
Turning above Phase I built-up blocks, forest and site roads

22 s of official aerial footage (12 Aug 2026): a turn above Phase I showing the built-up coast, forest roads, hills and sea.

Where is Phase I? Three drone viewpoints, from orbit to the ground
1 min 0 s
Where is Phase I? Three drone viewpoints, from orbit to the ground

60 seconds: down from orbit to Dara Sakor, then three drone positions looking back at Phase I from the north, from the sea and from Say Phuthang Blvd. to the south.

Rings of Dara Sakor 2008–2026
2 min 58 s
Rings of Dara Sakor 2008–2026

3 minutes: one satellite image a year, from forest to a port, an airport and two golf courses, ending on Phase I.

Want to see the land, or talk?

Sources: F-153. Prices and terms are governed by the formal sales contract; this page is not investment advice.

田
Tian Sisuo 田思索
Based in Sihanoukville, Cambodia for 8 years, trained in land resource management. Since June 2026, Sales Director of Soksan Sakor Land (Residential Land) Phase I (30 ha) at Dara Sakor. GIS, remote sensing and spatial data are my professional base; I build the tools I need to sell land myself.
Share
Comments