Dara Sakor Reflections · Video

Dara Sakor's built-up coast
two minutes from the air

Dara Sakor already has whole blocks of buildings. Two minutes over the stretch by the sea: factories, dormitories, rising buildings and roads.

By Tian Sisuo Length 2 min 9 s Date 2026-11-05
2 min 9 s

Source: Aerial footage by Coastal City Development Group · shot 12 Aug 2026 · reposted by Tian Sisuo, sales director, Soksan Sakor Land Phase I

Short answer

Aerial footage from Coastal City Development Group's files, shot on 12 Aug 2026, of the built-up area by the coast in Dara Sakor: for the first ninety seconds, factory buildings, dormitories, rising buildings and land awaiting development, with hills behind; then the drone drops low over a road with parked cars, building sites and a sealed road beside a drain. Silent, 2 min 9 s.

What the footage shows

Most of the 2 min 9 s is high overhead. From 0:00 the built-up coast and land beside it awaiting development, from 0:20 the buildings with hills behind, from 0:40 rows of factories and dormitories, and from 1:20 building sites under way. From 1:39 the drone drops low over a car by the roadside and the works, and from 1:49 rests on a sealed road with a drain beside it. There is no sound and no captions.

It was filmed on 12 August 2026 and comes from Coastal City Development Group's official files, shown as released. It answers one buyer's question: how much around this land is already up and running. The built-up area shown is outside the Phase I boundary, so do not take it as how Phase I looks. For Phase I land and prices, see Phase I land prices.

Chapters

tap a time to jump

  1. Built-up coast and land to be developed
  2. Buildings before the hills
  3. Factories and dormitories
  4. Building sites
  5. Low pass: a car by the works
  6. Sealed road and drain

Transcript

Silent aerial footage with no narration; the chapter notes below serve as the text of the film.

About the footage

FAQ

Is Dara Sakor the same place as Qixinghai (七星海)?
Yes. 达拉沙果 is now the standard Chinese name, matching Dara Sakor in English, តារាសាគរ in Khmer and the highway signs. 七星海 (Qixinghai), seen in some of the group's films, is the former name and is left as it appears in the original.
Is this built-up area Phase I?
No. These are finished and rising blocks by the coast in Dara Sakor; Phase I itself is still land being levelled. Its location is in the Dara Sakor land sales system.
Who made this, and can I share it?
It is official footage from Coastal City Development Group, the developer and operator of Dara Sakor, reposted here so it is easy to find and share; any cut is noted on this page. Feel free to share the link. For the original file or a site visit, contact me.

More videos

Along Long Bay, from sea to land the built-up coast and hills
Official · 38 s
Along Long Bay, from sea to land the built-up coast and hills

38 s of official aerial footage (12 Aug 2026): moving inland from the sea over factories with solar roofs, blocks and the forested hills beyond.

Where is Phase I? Three drone viewpoints, from orbit to the ground
1 min 0 s
Where is Phase I? Three drone viewpoints, from orbit to the ground

60 seconds: down from orbit to Dara Sakor, then three drone positions looking back at Phase I from the north, from the sea and from Say Phuthang Blvd. to the south.

Rings of Dara Sakor 2008–2026
2 min 58 s
Rings of Dara Sakor 2008–2026

3 minutes: one satellite image a year, from forest to a port, an airport and two golf courses, ending on Phase I.

Two golf courses in Dara Sakor
1 min 31 s
Two golf courses in Dara Sakor

90 seconds: Dara Sakor Coastal Golf Course by the bay and the Mountain Golf Course, 18 holes each, all real footage.

From the moment you land a Dara Sakor lifestyle film
Official · 1 min 55 s
From the moment you land a Dara Sakor lifestyle film

A 2-minute official film: landing, beach camps, night markets, a family by the sea at dusk. Chinese and English captions.

Cambodia's Rising Coastal Paradise the 2025 Dara Sakor festival
Official · 2 min 26 s
Cambodia's Rising Coastal Paradise the 2025 Dara Sakor festival

A 2 min 26 s official event film: jet skis, a boat parade, a road race, a cycling race, prize-giving and fireworks.

Want to see the land, or talk?

Sources: F-153. Prices and terms are governed by the formal sales contract; this page is not investment advice.

田
Tian Sisuo 田思索
Based in Sihanoukville, Cambodia for 8 years, trained in land resource management. Since June 2026, Sales Director of Soksan Sakor Land (Residential Land) Phase I (30 ha) at Dara Sakor. GIS, remote sensing and spatial data are my professional base; I build the tools I need to sell land myself.
Share
Comments