Phase I site progress: from clearing to roads

Site notes from Soksan Sakor Land (Residential Land) Phase I (30 ha), Dara Sakor, Cambodia, July–August 2026: the main road going in, land clearing finished, construction water, power and roads reaching the plots. The roads are built (gravel, not yet asphalted); Phase I is still empty land. Original posts, photos and FAQ.

By Tian Sisuo Posts 3 posts Updated 2026-11-05
Short answer

By the end of August 2026, Soksan Sakor Land (Residential Land) Phase I (30 ha) in Dara Sakor, Cambodia had been cleared and levelled, its roads were built and open to traffic (gravel, not yet asphalted), construction water and power were being brought in, and the gate, billboards and boundary markers were going up. Phase I itself is still empty land today.

Overview

Phase I of Soksan Sakor Land sits on the coast of Dara Sakor (formerly rendered in Chinese as Qixinghai), Koh Kong Province, Cambodia: about 30 hectares divided into 348 numbered plots. After "where is it?", the question buyers ask most is "how far along is it?". This page gathers the site notes I posted on WeChat between July and August 2026, in date order, with the original photos.

The sequence is simple. In late July the main road went in. By mid-August land clearing was nearly done. By the end of August the site had its roads, construction water, construction power and levelling: gravel roads and clearing complete, water and power in progress, and the project gate, billboards, survey and boundary markers installed. Here the utilities mean construction water and power brought to the plot boundary, plus a road to the boundary and a levelled site; household water and power connections are as set out in the sales contract.

All planned Phase I roads are built and drivable, with a gravel surface; asphalt has not been laid and no date has been set for it. So the flat cleared land and gravel lanes you see in the videos and satellite images are the real state of things today: there are no finished houses in Phase I, and what you buy is a plot you can plan and build on yourself.

Why keep these posts here: progress on site is the first thing to check before buying land, and a social feed forgets it in two days. Send me a plot number and I will send you current footage of that plot. Prices, payment plans and the legal right are on the Phase I land-for-sale page; for the location, watch the 60-second Where is Phase I video.

The posts, in date order

July: the main road goes in

The Depot

The main road of the 30-hectare Phase I is being laid.

On-site photo beside a red-soil road under construction, with a construction record box at the lower left.Aerial view of woodland ringed by red-soil roads, with a built-up seaside area and sea beyond.High aerial view of a golf course and resort, with a bay and islands beyond under a streaked sky.Panoramic aerial view of a golf course and resort, with red-roofed buildings around a lake and a beach beyond.Top-down aerial view of a golf course and a red-roofed resort, with ponds and woodland around.Aerial view of a bay beach and pier, with a golf course and ponds in front and small islands at sea.Aerial view of a seaside resort with rows of low-rise houses near a pier, and sea and islands beyond.High aerial view of a lake and coast with red-soil tracks across the peninsula, and islands and sky beyond.
Chinese original

七星海 · 海湖度假区一期 30 公顷主干道正在铺设。 山海相依,湖光相映。 诚邀四海朋友,共赏山海,共筑理想栖居。 来这里看看风景,也看看未来。

Mid-August: clearing nearly done

Kiri Sakor

The 30-hectare Phase I: land clearing almost complete.

Chinese original

七星海 · 海湖 度假区 30 公顷项目 土地清表工作即将完成

End of August: roads, water, power and levelling

Kiri Sakor

Phase I has its roads, utilities and level ground: gravel roads and clearing done, water and power in progress, gate, billboards and boundary markers in place.

A parked vehicle on a red-soil construction road with a green arch frame in the distance, with a check-in watermark.Design drawing of a green ornate entrance gate with dimensions, and a human figure beside it for scale.A bare red-soil plot with a utility pole, trees and clouds in the distance, with a check-in watermark.A gravel road beside a red-soil plot with two utility poles under a heavy sky, with a check-in watermark.A black pipe laid across a red-soil construction site, with a lone tree beyond, with a check-in watermark.A black pipe laid beside a gravel road, with factory buildings in the distance, with a check-in watermark.Master plan overview of Dara Sakor with several functional zones and attraction markers over the coast and lake.Phase I promotional image of the resort area, with a yellow outline on an aerial panorama and a bilingual slogan above.Phase I promotional aerial image with the plots outlined in red and a Khmer headline above.
Chinese original

七星海 · 海湖度假区一期三通一平初步实现。 石子路、清表整平已完成,供水、供电持续推进。 项目门楼、广告牌、测量打桩等配套同步落地。 从规划到现场,项目正在一步一步变成现实。

FAQ

Is Phase I built?
No. Phase I is still empty land. What is done is clearing and levelling, the roads (gravel, not yet asphalted), and construction water and power in progress.
What do the site utilities include?
Construction water and construction power to the plot boundary, a road to the boundary, and a levelled site. Household water and power connections are as set out in the contract.
Are the roads asphalted?
Not yet. The Phase I roads are built and open, with a gravel surface; no date has been set for asphalt.
Can I see what a particular plot looks like now?
Yes. Send me the plot number on Telegram, WhatsApp or email and I will send you current footage.

Want to see the land, or talk?

Sources: F-036, F-044, F-106, F-112, F-142, F-152, F-153. Posts are reproduced as published; prices and terms are governed by the formal sales contract. Not investment advice.

All topics

Phase I sales updates
Phase I sales updates

Soksan Sakor Land (Residential Land) Phase I (30 ha) in Dara Sakor, Cambodia went on sale on 17 July 2026. Plo…

8 posts
Dara Sakor from the air: drone and satellite views
Dara Sakor from the air: drone and satellite views

My Dara Sakor drone and satellite videos from July to November 2026: single-take drone footage, 16 years of ch…

6 posts
Lakes and sea at Dara Sakor
Lakes and sea at Dara Sakor

Soksan Sakor Land in Dara Sakor, Cambodia lies between the hills and the Gulf of Thailand, with lakes in betwe…

8 posts
AI tools for selling land: a sales director's beta notes
AI tools for selling land: a sales director's beta notes

Since July 2026 I have built my own AI tools to sell Soksan Sakor Land (Residential Land) Phase I (30 ha) in D…

5 posts
Investment and co-development in Dara Sakor
Investment and co-development in Dara Sakor

Dara Sakor is the Cambodia-China Comprehensive Investment and Development Pilot Zone, developed by Coastal Cit…

5 posts
Working and living in Dara Sakor
Working and living in Dara Sakor

Working in Dara Sakor means a sales office looking out over lakes and sea, staff housing among the trees and, …

6 posts
Notes from a land sales director in Cambodia
Notes from a land sales director in Cambodia

Tian Sisuo has lived in Cambodia for eight years and since June 2026 has been sales director of Soksan Sakor L…

11 posts
田
Tian Sisuo 田思索
Based in Sihanoukville, Cambodia for 8 years, trained in land resource management. Since June 2026, Sales Director of Soksan Sakor Land (Residential Land) Phase I (30 ha) at Dara Sakor. GIS, remote sensing and spatial data are my professional base; I build the tools I need to sell land myself.

Find me on:TelegramGitHubLinkedInFacebookYouTubeTikTok抖音X

Share
Comments